PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bathroom roughing at Rooms 132, and 136 Facing North (800x600).jpg Fibertech on site at Cherry Street  (800x600).jpg Fireproofing continues at the 1st Floor Facing South (800x600).jpg Installing duct work hangers at the 2nd Floor Facing West (800x600).jpg Installing top metal track at the 2nd Floor Facing North (800x600).jpg Continued patching Stair -2 (800x600).jpg
Previous pageNext page Fibertech on site at Cherry Street  (800x600)
Fibertech on site at Cherry Street (800x600)